Lifecycle Management with BIM

From a lifecycle management perspective, including facility professionals in the project management process allows for a facilities and operation perspective to be presented and considered throughout the building design and construction periods.

The process also presents an opportunity, through the model’s database, to transfer quality data that is generated at different building lifecycle phases to an integrated workplace management system (IWMS), which enables facilities professionals to hit the ground running once the building is commissioned and occupied.


But what information is needed to ensure a seamless transition from the design-build phase to operations? Download our guide, to explore best practices in data gathering and implementation.

Top
Află cum poți crea o strategie aliniată la obiectivele organizației pentru optimiza costurile operaționale și a construi un mediu de lucru care să inspire angajații.
DESCARCĂ PREZENTAREA
TE-AI ABONAT CU SUCCES!
ÎȚI MULȚUMIM PENTRU INTERES! NU UITA SĂ CONFIMI ABONAREA. PENTRU MAI MULTE INFORMAȚII CONSULTĂ EMAILUL TRANSMIS PE ADRESA INDICATĂ.
ÎNCHIDE
AFLĂ PRIMUL NOUTĂȚILE!
PENTRU A PRIMI ACTUALIZĂRILE ARCHIBUS PRIN EMAIL TE INVITĂM SĂ TE ABONEZI.
ABONARE
Prin bifarea acestei casete, declar că am citit și sunt de acord cu Politica de Confidențialitate a site-ului și doresc să primesc comunicări de la ARCHIBUS Solution Center - România. Sunt conștient că pot să mă dezabonez în orice moment.
Copy link
Powered by Social Snap